Water treatment plant - Vír water reservoir

We have created a BIM model of the area around the Vír dam.
30.3.2022

The task was to map the existing site including buildings (technological units). Part of the assignment was the requirement to create BIM models at LOD 100 level of the exterior and LOD 300 level of the interior including the process piping.

Want to know more? Information on this contract can be found on the BIM3D.

Do you want to be informed about the news? We will send you Georevue.
I want to subscribe